Duramax Building Products 00212 Manuel d'utilisation et d'entretien

Naviguer en ligne ou télécharger Manuel d'utilisation et d'entretien pour Ouvreur de porte de garage Duramax Building Products 00212. Duramax Building Products 00212 Use and Care Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 36
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
ALL PURPOSE VINYL STORAGE SHEDS
A Product of
USP
US POLYMERS INC
USP
OWNER’S MANUAL /
Instructions for Assembly
Size 10’x 8’
• All Weather Durable PVC
• Won’t Dent, Rust, Rot or Mildew
• Tall Walk In Shed
• Never Needs Painting
• 61” Wide Double Doors
• Easy Assembly
• High Wind Tested
• Snow Load Tested 20lbs/sq. foot
• Pad Lock Ready (Lock not included)
• Wooden or Cement Foundation Needed
Call us for any missing or damaged parts.
Do not return to the store.
Storage Shed
Storage Shed
Customer
Service Hotline
(800) 483-4674
www.uspolymersinc.com
Patent #416.091
TM
Requires two people and takes about
4-5 hours for Installation.
Your Total Solution To maintenance Free Storage Sheds.
Available Kits
• Foundation Kit Available
• Modular 2.5’ Extension Kits Available
• 10’x8’ Window Kits Available
Ver: 2.0
Vue de la page 0
1 2 3 4 5 6 ... 35 36

Résumé du contenu

Page 1 - Storage Shed

ALL PURPOSE VINYL STORAGE SHEDSA Product ofUSPUS POLYMERS INCUSPOWNER’S MANUAL / Instructions for AssemblySize 10’x 8’• All Weather Durable PVC• Won’t

Page 2 - Parts List

6CCAB21B3RA11. Working outside Use (S1) screws to secure column to bases (B21) and (B3RA).10. Slide corner column (CCA) into side panel (SP ) pushing

Page 3

7Fig.3: Use (S1)screws.Fix (CB3XA) to (CMA) columns.12. Stabilize the side panels with center bands (CB3XA) & (CB2A). Fix (FCB) fitting to corner

Page 4 - Limited Fifteen Year Warranty

814. Stabilize the side panels with center bands (CB3XA) assembly. Fix center band fitting (FCB) to corner column (CCA) with (S2) screws. See Fig. 1Fo

Page 5

9CCAB21B1LA17. Working outside use (S1) screws to secure column to bases (B21) and (B1LA).16. Slide corner column (CCA) into side panel (SP ) pushing

Page 6 - B. Walls & Columns

10CMAB22CCACB3XA1&53B21InsideCB2A4 & 6218. Stabilize the side panels with center bands (CB2A) & (CB3XA). Fix (FCB) fitting to corner colum

Page 7

19. Insert the side panel (SP ) into the groove of column (CCA). Start at the bottom with panel at an angle then push into place.20. Slide door colum

Page 8 - Fig.1: Use

C. Roof FrameParts Needed:22. Fix center band (CB4A) to (CDLA) and Base (B1LA) See figures (fig.1), (fig.2) and (fig.3).Fig.2: Use(S1) screw.Fix (C

Page 9

133. Insert the door column fittings (FDCL) and (FDCR) left and right into the door columns (CDLA) and (CDRA). Fix with (S1) screws from inside the s

Page 10

14Roof Structure Exploded ViewRS6XARS2ARS1ARS4XARS4XARS3XARS3LARS2ARS1ARS9ARS8AMJMJDSHRS10ARS11ARS11ARS12ARS12ARS10ARS7XARS5ARS5ARS2ARS3LARS3XAMJRS2AR

Page 11 - Fig.2: Use (S1)

15Front roof structure assembly4. Assemble front roof structures (RS1A) 2 nos. and middlejoining support (MJ) together with 4 (S1) screws.RS1AStep 1Th

Page 12 - Inside back wall

Note: Check all parts prior to installation.CODE DESCRIPTION QTYB1LA FRONT ‘U’ CHANNEL LEFT 1B1RA FRONT ‘U’ CHANNEL RIGHT 1B21 SIDE ‘U’ CHANNE

Page 13

RS1ARS1ARS1ARS1ABack roof structure assemblyRS8ARS9ARS9ARS8ARS1ARS1AU-Channel OpeningU-Channel OpeningU-Channel Opening16Step 1These holes upRS2ARS2AR

Page 14 - 4 & 6

1710a. Insert 90 degree joint (RJ) into the roof structure (RS3LA). Use a hammer to push in. Use (S1) screws to fix. Repeat on other end of (RS3XA). S

Page 15

1813. Place the assembled front roof structure into position on top of door columns. Line up pre-drilled holes with door column fittings (FDCL) &

Page 16 - C. Roof Frame

1915. Place the assembled back roof structure into position on top of middle columns (CMA). Line up pre-drilled holes with middle column fittings (FMC

Page 17

20CCANoteNotice the U-channel up positionon roof structures (RS1A).fig.1fig.2RS3LARS3XARS3LARS3XARS2ASecure (RJ) 90 degree joint to (RS1A) with (S1) s

Page 18 - Roof Structure Exploded View

2117. Place the assembled roof structure (RS5A) & (RS6XA) intoposition on roof structure support (RS8A) at the left side of the shed.Use (S1) scre

Page 19 - U-Channel Opening

22RS5ARS9ARS9ARS5ARS7XAfig.1fig.2RS5A19. Place the assembled roof structure (RS5A) & (RS6XA) into position on roof structure supports (RS9A) at th

Page 20

RS7ARS5ARS4XARS7XAS721a. Attach the roof structures (RS4XA) 4 nos. to (RS5A), (RS6A) assembly and (RS5A), (RS7A) assembly with (S7) screws.fig.3fig.1R

Page 21

22. Attach roof structure support (RS10A) and (RS11A) to roof structures (RS5A), (RS6XA) & (RS7XA) using (S1) screws.See fig.1,2 and 3.RS10ARS11AR

Page 22 - Inside of shed

23. Attach the roof structures support (RS12A) with (RS5A) to (RS5A) and (RS6XA) to (RS7XA) with (S1) screws. See fig.1 and 2.fig.1RS6XARS7XA25RS12ARS

Page 23 - CMA CMA CMA

CB3XAMJCB3XACB3XAMJCB3XAMJRS6XARS2ARS4XARS4XARS3XARS3LARS2ARS1ARS9ARS8AMJMJDSHRS10ARS11ARS12ARS10ARS7XARS2ARS3LARS3XAMJRS2ARS1ARS4XARS4XARS5ARS5AFPLFP

Page 24

3. Start attaching the roof panels from (FPL) corner side by sliding the roof panel (RP ) to roof structure. Locate the hole positions of the roof pa

Page 25

27Fig.7Front of ShedRRSFig.2Fig.3RPFig.4Fig.5Fig.6FPRRPFig.8RRSFig.9RRS

Page 26

1. Attach the doors left and right (see fig.1) with Loose pin hinges on door columns (CDLA) and (CDRA).E. DoorsParts Needed:(1) Door Left(1) Door Righ

Page 27

292. After completing the panel assembly, applysilicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.Note

Page 28

30F. Optional Ventilation KitACCESSORIESCODE DESCRIPTION QTYVC VENTILATION COVER 2VCP VENTILATION COVER PIN 4VENTILATION COVER PIN (VCP)VENTILA

Page 29

1. Shed or shed foundation should be placed on concrete footing by use of anchor bolt and nut. Using a carpenters square, line up corners. Align U-Cha

Page 30 - D. Roof panels

323. Attach each side panel (SP ) on top to the roof structure (RS1) and (RS3). Using a dia. 3mm (1/8”)drill with a power drill, make two equal dista

Page 31 - Front of Shed

Duramax Storage ShedLimited Fifteen Year WarrantyU.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and o

Page 32 - E. Doors

A. Foundation & Base Frame1.Use pressure treated 2” x 4” (5x10cm) to build a foundation structure that has an outside dimension of96” x 127” (2438

Page 33 - Base U-channel

Parts Needed:1.Slide door column (CDRA) into the U-Channel Base (B1RA) on the right side of the door. Line up the pre-drilled holes on (CDRA) Column w

Page 34 - F. Optional Ventilation Kit

B1RACCA0utsideS1B223. Slide corner column (CCA) into side panel (SP ) pushing the column to the side panel.4. Working outside use (S1) screws to secu

Page 35 - Parts needed:

5.To stabilize the front panel attach center band (CB1A). Start with center band fitting (FCB), fix to corner column (CCA) with (S2) screws. See figur

Page 36 - Information

7. Assemble the center bands (CB2A) & (CB3XA) with middle joining support (MJ). use (S1) screws. See fig. Make 2 sets.58. Assemble the two center

Commentaires sur ces manuels

Pas de commentaire